A sister plant of one of ProDecon’s regular customers experienced an unplanned major event. The team were asked to respond quickly to a rapidly developing scope of work. The initial scope required ProDecon® chemically clean two utility boiler followed by a pre- commission chemical clean of a third boiler that was undergoing a substantial rebuild.
As the work progressed on the utilities area. The client enquired if ProDecon® could support with the chemical cleaning of three waste heat boilers attached to the ethylene cracking furnaces as the ongoing inspection had reported the need for intrusive mechanical works.
An inspection of the remaining four waste heat boilers concluded similar fouling with ProDecon® asked to accommodate the chemical clean of the additional waste heat boilers in the allocated timeframe.
The Challenge
Case Studies
Utility & Waste Boiler Chemical Cleaning
UK | Petrochemical
Full Case Study PDF Download
ProDecon ISO Certificates & Accreditations available on request
Process Decontamination Systems Ltd.
Unit 1 Alvaston Business Park, Nantwich, Cheshire
CW5 6PF United Kingdom