ProDecon® Case Studies

The team’s expertise was sought to support a trial at a waste to energy plant which drew air by utilizing a fan designed to operate at 65% power. A design issue led to the fan power rapidly rising to 80%, leading to the boiler shutting down for a total clean. This shutdown would happen every quarter, despite the use of micro-explosions twice a quarter.

 

The Challenge

Online Boiler Cleaning

Europe | Waste to Energy plant

Full Case Study PDF Download

Online Boiler Cleaning

ProDecon ISO Certificates & Accreditations available on request

Process Decontamination Systems Ltd.

Unit 1 Alvaston Business Park, Nantwich, Cheshire

CW5 6PF  United Kingdom

Phone: +44 (0) 1270 446601

Email: sales@prodecon.com

www.prodecon.com