The team’s expertise was sought to support a trial at a waste to energy plant which drew air by utilizing a fan designed to operate at 65% power. A design issue led to the fan power rapidly rising to 80%, leading to the boiler shutting down for a total clean. This shutdown would happen every quarter, despite the use of micro-explosions twice a quarter.