ProDecon was asked to decontaminate multiple units including the Crude Distillation Unit, Vacuum Distillation Unit and the Hydro treating Unit, all to run in parallel. These units were known to have asphaltene and coke deposits that block flow pathways reducing the efficiency of the units. On previous shutdowns these have required intensive mechanical work.
Whilst the work was completed in parallel the decontamination was divided into 18 circuits over 3 units. The scope covered all heaters, columns, strippers and overhead systems..